Letter of claim received: a landlord’s first 20 working days
If you receive a housing disrepair letter of claim, you should normally respond within 20 working days of receipt. Under the protocol, receipt is treated as taking place two days after the date on the letter.

Use that time to review the tenant's complaints, gather the requested documents, arrange an inspection and decide your position on the proposed expert. If repairs are needed, start dealing with them and keep a clear record of the action taken.
What should the letter of claim contain?
The Housing Conditions Claims Protocol applies to residential properties in England. It covers claims about poor housing conditions, whatever the value of the damages claim.
The tenant should send the letter of claim as early as reasonably possible.
When the letter arrives, check that it includes the information below. If something is missing, make a note of it and mention it in your response. Don't let missing details delay the rest of your work.
| What the letter should include | What you should do |
|---|---|
| The tenant's name, property address, phone number and details of when access is possible | Use the information to arrange an inspection |
| Details of the defects, often listed room by room | Use the list to plan your inspection |
| The history of the problems and any previous repair attempts | Compare it with your maintenance records |
| Details of when and how you were told about the problems | Check your emails, call notes and repair logs |
| The effect on the tenant, including any personal injury | Pass the information to your solicitor or insurer |
| Details of anyone else making a personal injury claim | Record who is making a claim |
| Special damages, such as damaged belongings | Keep the details for the compensation part of the claim |
| The proposed expert and a draft letter of instruction | Review the proposal and decide your position before the deadline |
| Relevant documents held by the tenant | Add the information to your claim file |
The letter should also request relevant documents from you. These may include:
- The tenancy agreement, including its conditions.
- The tenant's file.
- Records showing when you were told about the problems, including meeting notes and records of conversations.
- Inspection reports and documents relating to the work needed.
- Relevant electronic records.
Documents about rent arrears or unrelated tenancy matters are not normally relevant to the disrepair claim.
Your first 20 working days: a step-by-step plan
The protocol says landlords should normally reply within 20 working days of receiving the letter. Receipt is treated as taking place two days after the letter's date.
The deadline gives you time to investigate the complaint and respond properly. It isn't a reason to wait until the last minute. If you can deal with something sooner, do so.
| Working days | What to do | What you should have by the end |
|---|---|---|
| Day 0 | Record the letter date, arrival date, deemed receipt date and response deadline | A dated entry in your claim diary and calendar |
| Days 1–2 | Check the reported problems for urgent risks and acknowledge the letter | Urgent work arranged where needed and a named contact for the claim |
| Days 1–5 | Contact your solicitor or insurer and appoint someone to manage the claim | One person responsible for coordinating the response |
| Days 3–10 | Gather the requested documents and other relevant records | An organised file with dated, indexed documents |
| Days 5–12 | Inspect the property and investigate the reported defects | A dated inspection report with photographs and readings where appropriate |
| Days 10–15 | Review the proposed expert and decide your position | A written decision and instructions, where needed |
| Days 10–20 | Start necessary repairs where possible, recording the property's condition first | A repair schedule showing what is being done and when |
| Days 15–20 | Send your response and the relevant documents | A copy of the response and proof that it was sent |
The aim is to understand the complaint, establish what has happened and respond within the deadline.
Keep records of calls, emails, inspections, repair instructions and completed work. These records can help show what you knew, when you knew it and what action you took.
Day 0: get the dates right
Write down the date on the letter, the date you received it and the date it is treated as having been received. Calculate your response deadline and add it to two calendars. If there's any doubt about the deadline, work to the earlier date and check the calculation with your solicitor.
For example, a letter dated Monday 2 November 2026 is treated as received on Wednesday 4 November. Using that date, 20 working days later is Wednesday 2 December 2026.
Days 1–2: deal with anything urgent
Read through the tenant's list of problems and identify anything that needs immediate attention. This could include an active leak, no heating or hot water, exposed electrical wiring, a ceiling that may be unsafe or extensive mould in a bedroom.
Arrange urgent work straight away, even while you deal with the claim.
Acknowledge the letter in writing. Give the tenant a named contact and let them know when they can expect your full response.
Days 1–5: get the right people involved
Assign one person to manage the claim and nominate someone to cover if they're unavailable.
If you don't have an in-house legal team, speak to a solicitor early. Check your landlord insurance policy to see whether it covers legal expenses and whether your insurer needs to be notified at this stage.
Days 3–10: gather the records
Collect the documents requested in the letter, along with anything else that helps explain what happened.
This could include repair requests, job sheets, contractor invoices, photographs, emails, text messages, call notes and records of attempts to arrange access.
Put everything in date order and create a simple index. This makes it easier to spot missing information and respond accurately to the claim.
Your response should include copies of the relevant records and documents requested by the tenant, in line with the protocol.
Days 5–12: inspect the property and find the cause
Arrange your own inspection as early as possible. The protocol covers access for inspections and repairs, so arrange access with the tenant in line with the tenancy agreement and applicable requirements.
Use an appropriately qualified surveyor to inspect accessible areas, record visible defects and take photographs and relevant readings where appropriate.The surveyor can assess likely causes based on the available evidence and identify where further specialist or intrusive investigation may be required.
For damp and mould, finding the cause is particularly important. Condensation, penetrating damp, rising damp and leaking pipes can all need different solutions. A dated report, supported by photographs and relevant readings, gives you a clearer basis for deciding what work is needed and explaining your response to the claim.
Days 10–15: decide on the expert
The tenant’s letter should name a proposed expert and include a draft letter of instruction. If you don’t object within 20 working days of receiving the letter, the expert should be appointed as a single joint expert. The tenant’s proposed letter of instruction is then used.
You can respond by:
- Agreeing to use the proposed expert and the letter of instruction.
- Agreeing to the expert but sending separate instructions, with a copy to the tenant.
- Declining to use a single joint expert and stating whether you agree to each side’s expert carrying out a joint inspection.
The model letter of instruction asks the expert to assess whether the reported defects exist, whether any are structural, and what caused them. It also asks about the property’s age, character and expected lifespan, along with the work needed and its estimated cost.
Read the proposed instructions carefully before agreeing. If you want additional questions included, you can send separate instructions.
Cost is another consideration. With a single joint expert, both sides usually split the inspection and report costs equally. If each side appoints its own expert, each pays for their own.
Choose an expert based on their relevant qualifications, experience and independence, not on whether you think they will favour your position. The protocol refers to CPR Part 35, which requires experts to act independently and puts their duty to the court above either party's interests.
Days 10–20: start necessary repairs
One aim of the protocol is to help landlords deal with repairs promptly. The model letter of claim asks whether you intend to carry out the work straight away or wait until the expert has inspected the property.
Deal with urgent repairs and safety risks without delay. Before starting other work, record the property's condition with dated photographs and readings taken from consistent positions.
Then write to the tenant’s solicitor to explain what work you plan to carry out and when. Keeping a clear record of the property’s condition and the planned repairs can help avoid disagreements about the evidence later.
Days 15–20: send your response
Your response should include:
- Copies of the relevant documents the tenant requested.
- Your position on the proposed expert and the draft letter of instruction.
- Copies of any separate instructions you send to the expert.
- If you do not agree to a single joint expert, confirmation of whether you agree to a joint inspection.
You can also set out your position on responsibility for the defects, the proposed repairs and any settlement offer at this stage. Alternatively, the protocol allows you to address these matters within 20 working days of receiving the expert’s report.
If you genuinely cannot respond by day 20, ask for an extension in writing before the deadline and explain why you need more time. The protocol allows deadlines to be changed by agreement. It also says the court will expect an explanation if you haven't followed the protocol or if its time limits have been varied.
After day 20: inspection, report and your next response
The protocol sets out what should happen next.
- Property inspection: This should take place within 20 working days of your response, either by the single joint expert or through a joint inspection.
- Single joint expert’s report: The expert should send the report to both sides within 10 working days of the inspection.
- Report after a joint inspection: The experts should send an agreed schedule within 10 working days. This should list the defects and proposed repairs both sides agree on, the work timetable and any areas of disagreement, with reasons.
- Your next response: Unless you have already dealt with these points, respond within 20 working days of receiving the report or agreed schedule. Your response should cover:
- Whether you accept responsibility for any of the defects.
- Your reasons for disputing responsibility, if applicable.
- Any issues with receiving notice of the defects or gaining access to the property.
- A full list of the repairs you intend to carry out, including start and completion dates and a work timetable.
- Any compensation offer.
- Any offer relating to costs.
If the dispute remains unresolved, both sides should review their positions and consider ways to settle it. The protocol treats court proceedings as a last resort. Depending on the circumstances, options may include mediation, a social landlord’s complaints procedure, the Housing Ombudsman Service for social housing tenants or a redress scheme for private tenants.
Urgent cases
The protocol allows a tenant to instruct an expert earlier if there is an urgent need. Examples include a serious health or safety risk, an application for an interim injunction or the need to preserve evidence.
The protocol's model letter of instruction also asks the expert to notify the instructing solicitors immediately if they identify works that may require an application for an interim injunction.
For landlords, the message is straightforward: if the letter describes a serious hazard, deal with it promptly. You may also need to work to a shorter timetable.
Keep a record of everything
You may need to explain any difficulties you had gaining access to the property. Keeping clear, dated records will help support your account.
Keep copies of:
- The date on the letter, when it arrived, the deemed receipt date and the day 20 deadline.
- All contact with the tenant, including the date, method, people involved and what was discussed.
- Every access attempt, including the date, time, arrangements made and outcome.
- Dated photographs taken before, during and after repairs, ideally from the same positions.
- Any readings, noting the equipment used, where they were taken and the conditions at the time.
- Contractors’ job sheets, invoices and photographs showing completed work.
- Decisions made, who made them and the reasons behind them.
- All documents and correspondence sent, including when and how they were sent.
When to involve a solicitor
If you don't have in-house legal support, contact a solicitor during the first week. Some situations make this especially important:
- Personal injury is claimed. If expert evidence beyond a GP’s letter is needed, the Personal Injury Pre-Action Protocol may apply.
- Limitation is raised. The tenant may ask you to agree not to rely on a limitation defence while the protocol process is ongoing.
- Court proceedings have already started. The protocol says the parties should apply for a stay while its steps are completed.
- Responsibility or notice is disputed. These issues can involve legal questions as well as building defects.
- Several claims arise from the same block or estate. You may need legal advice on how best to manage them.
A surveyor can help identify the defects and their likely causes. A solicitor can advise on what those findings mean for your legal position. Many claims need input from both.
Why ignoring the letter can cost more
The protocol is clear that failing to respond within 20 working days, or not responding at all, is a breach. The tenant can then issue court proceedings.
The court may order a party who has unreasonably failed to follow the protocol to pay costs or face other sanctions.
The Practice Direction on Pre-Action Conduct and Protocols lists possible sanctions. These can include paying the other party’s legal costs, sometimes on an indemnity basis. A defendant may also face interest of up to 10% above the base rate.
Costs can increase as the claim progresses. If a claim settles without court proceedings on terms that justify bringing it, the protocol says the landlord should pay the tenant’s reasonable costs.
Delays can also add to the underlying problem. Every week a reported defect remains unresolved may extend the claim period and give the court more evidence to consider. Acting early can help limit both the repair work needed and the costs of dealing with the claim.
Social landlords: Awaab’s Law also applies
Awaab’s Law applies to registered social housing providers, not private landlords. A landlord may become aware of a hazard when someone reports it on the tenant’s behalf, including a solicitor or another representative.
For a council or housing association, a letter of claim describing damp and mould may therefore also trigger the relevant Awaab’s Law requirements.
For social landlords, Awaab's Law introduces separate statutory deadlines for investigating and addressing qualifying hazards.
Landlords must investigate potential significant hazards within 10 working days of becoming aware of them. If a significant hazard is confirmed, landlords must complete relevant safety work within five working days after the investigation concludes.
Emergency hazards require investigation and necessary safety work within 24 hours.
These obligations operate separately from the Housing Conditions Protocol's usual 20-working-day response period.
See Article 02 and the Awaab’s Law Deadline Calculator for more information.
Where Rosecrest fits
Rosecrest Group Ltd is a RICS-regulated firm. We cover London’s 32 boroughs and the City of London, as well as towns around the M25 in Surrey, Kent, Hertfordshire and Essex.
When a letter of claim arrives, we inspect the property, take photographs and readings, investigate the likely cause of the defects and set out our findings and recommended work in a written report.
Rosecrest offers Damp, Mould and Condensation Surveys from £540 including VAT, subject to the property's circumstances and the agreed scope of inspection.
For housing conditions claims requiring independent expert evidence, we also provide CPR Part 35-compliant reports, subject to formal instruction, conflict checks and agreed terms.
Our inspections are visual and non-invasive, with findings based on accessible areas and the evidence available at the time of inspection.
We work with landlords and tenants through their solicitors, and as single joint experts. Expert witness work is a separate service. When instructed as an expert witness, we provide independent evidence for the court. We do not quote for or carry out repairs or mould treatment at that property as part of, or alongside, that instruction.
We assess every expert witness instruction for conflicts of interest before accepting it, ensuring the appointed surveyor can fulfil their duty to provide independent and impartial evidence.
Book a protocol inspection: Housing disrepair surveys or call 020 4576 5317.
FAQs
How long does a landlord have to respond to a letter of claim?
The protocol says landlords should normally respond within 20 working days of receipt. Receipt is treated as taking place two days after the date on the letter. Failing to respond within the deadline, or not responding at all, is a breach, and the tenant can then issue court proceedings.
Can I carry out repairs before the expert inspects?
Yes. Urgent repairs and safety work should not be delayed while waiting for an expert inspection.
Where it is safe and practical to do so, record the property's condition using dated photographs and relevant readings before work begins. However, evidence collection must not delay emergency action.
Inform the tenant or their solicitor of the repairs being undertaken and the proposed timetable.
Do I have to accept the tenant’s proposed expert?
No. You can object to the proposed expert, agree to use them but provide your own separate instructions, or decline a single joint expert and say whether you agree to a joint inspection involving an expert for each side.
If you do not object within 20 working days of receipt, the proposed expert should be instructed as a single joint expert.
Who pays for the expert?
With a single joint expert, each side pays half the cost of the inspection and report. If each side appoints its own expert, each pays for their own expert.
If the claim settles without court proceedings on terms that justify bringing it, the landlord should pay the tenant’s reasonable costs, in line with the protocol.
Does the protocol apply to small claims?
Yes. The protocol says it should be followed in all cases, regardless of the value of the damages claim. It applies to claims involving residential property in England.
